$100K-$250K Pacific Heights multifamily renovation
Work category: 1p; kitchen, install new waterlines and reroute drainage for kitchen, sink, dishwasher, and refrigerator. master bathroom installed new waterlines reroute to bathroom sink lines drain and water connecting…
Project scope
Work category: 1p; kitchen, install new waterlines and reroute drainage for kitchen, sink, dishwasher, and refrigerator. master bathroom installed new waterlines reroute to bathroom sink lines drain and water connecting toilet to existing piping and install bathroom and install shower valve and drain guest bathroom install shower valve and drain top install new waterlines to faucet and toilet connecting to existing drain pipe
Why this may be worth pursuing
Firms on the filing
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
Not shown on this page
Sourced from San Francisco Department of Building Inspection public filings.