Under $100K Presidio Heights single-family renovation
Work category: 2pa; 1.main kitchen sink work scope on rough-in: re- stub two cold water and two hots water, fixing the existing waste pipe to new center for sink. on trim out installing new faucet and garbage disposal…
Project scope
Work category: 2pa; 1.main kitchen sink work scope on rough-in: re- stub two cold water and two hots water, fixing the existing waste pipe to new center for sink. on trim out installing new faucet and garbage disposal, p-trap, angle stops. 2. refrigerator water line for the ice maker box reconfigure f the box on the existing location. 3. moving the existing gas line down on same location for new range with a shut off valve
Why this may be worth pursuing
Firms on the filing
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
Not shown on this page
Sourced from San Francisco Department of Building Inspection public filings.