$250K-$500K Twin Peaks single-family renovation
Filed 4 months ago · additions alterations or repairs · Grade B · Mid stage
Remodel kitchen,relocate gas furnace,water heater,washer & dryer,convert 581 sq ft garage into conditioned space,including two bedrooms and two bathrooms
$250K-$500K
value range
1
filings to date
Why this may be worth pursuing
Filed 4 months ago, in the $250K-$500K range. A general contractor is named on the filing.
Firms on the filing
General contractorArkspace Design Build Llc
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
1 filing on record, first filed Nov 2025, latest activity Apr 2026.
Dated, itemized filing history is part of the paid product.
Not shown on this page
Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
10 project unlocks included every month · no credit card
Previous project$92K Pacific Heights multifamily renovation
3 of 3 select projects
Sourced from San Francisco Department of Building Inspection public filings.