PermitPipeline
FirmsSF architects & engineersPragmatic$1M-$5M Financial District/South Beach…

$1M-$5M Financial District/South Beach commercial renovation

Filed Sep 2025 · otc alterations permit

Deferred mep for: mechanical-replace low pressure ductwork for ste 700, install 2 new terminal units. all plumbing is replacing (e) fxitures at (e) location. electrical- new power and signal devices throughout the…

$1M-$5M
value range
3
filings to date

Project scope

Deferred mep for: mechanical-replace low pressure ductwork for ste 700, install 2 new terminal units. all plumbing is replacing (e) fxitures at (e) location. electrical- new power and signal devices throughout the space, new 2022 title-24 compliant lighting and controls. plumbing-install

Why this may be worth pursuing

Filed Sep 2025, in the $1M-$5M range. A general contractor is named on the filing; a design firm is identified, an architecture firm is identified.

Firms on the filing

EngineeringPragmatic Design1 firmGeneral contractor1 firmArchitecture1 firm

Roles are taken from the permit record. Firm names are part of the paid product.

Filing history

3 filings on record, first filed May 2025, latest activity Sep 2025. Dated, itemized filing history is part of the paid product.

Not shown on this page

Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
See matching projects free
10 project unlocks included every month · no credit card

Sourced from San Francisco Department of Building Inspection public filings.