$1M-$5M Financial District/South Beach commercial renovation
Filed Sep 2025 · otc alterations permit
Deferred mep for: mechanical-replace low pressure ductwork for ste 700, install 2 new terminal units. all plumbing is replacing (e) fxitures at (e) location. electrical- new power and signal devices throughout the…
$1M-$5M
value range
3
filings to date
Project scope
Deferred mep for: mechanical-replace low pressure ductwork for ste 700, install 2 new terminal units. all plumbing is replacing (e) fxitures at (e) location. electrical- new power and signal devices throughout the space, new 2022 title-24 compliant lighting and controls. plumbing-install
Why this may be worth pursuing
Filed Sep 2025, in the $1M-$5M range. A general contractor is named on the filing; a design firm is identified, an architecture firm is identified.
Firms on the filing
EngineeringPragmatic
Design1 firmGeneral contractor1 firmArchitecture1 firm
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
3 filings on record, first filed May 2025, latest activity Sep 2025.
Dated, itemized filing history is part of the paid product.
Not shown on this page
Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
10 project unlocks included every month · no credit card
Previous projectFinancial District/South Beach commercial renovation
3 of 3 select projects
Sourced from San Francisco Department of Building Inspection public filings.