Mission multifamily renovation
Filed 1 month ago · additions alterations or repairs · Grade A · Mid stage
Revision to. remove a post to be replaced by 3 structural beams
2
filings to date
Why this may be worth pursuing
Filed 1 month ago. A general contractor is named on the filing; an engineering firm is identified, an architecture firm is identified.
Firms on the filing
DesignRefresh And Build Inc
Engineering1 firmArchitecture1 firm
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
2 filings on record, first filed Oct 2025, latest activity Aug 2026.
Dated, itemized filing history is part of the paid product.
Not shown on this page
Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
10 project unlocks included every month · no credit card
1 of 3 select projects
Next project$30K Twin Peaks single-family renovation
Sourced from San Francisco Department of Building Inspection public filings.