PermitPipeline
FirmsSF architects & engineersSfdpwBayview Hunters Point commercial renovation

Bayview Hunters Point commercial renovation

Filed 5 months ago · additions alterations or repairs · Grade A · Mid stage

Ref#:. work consisting of contructing new 4 stop freight elevator in existing shaf. 2hr rated shaft walls plus 2 new 2 hr rated shaft walls to creat the 4 sided shaft enclosure. project scope includes cutting into the…

2
filings to date

Project scope

Ref#:. work consisting of contructing new 4 stop freight elevator in existing shaf. 2hr rated shaft walls plus 2 new 2 hr rated shaft walls to creat the 4 sided shaft enclosure. project scope includes cutting into the (e) mat foundation to create the elevator pit, plus new steel

Why this may be worth pursuing

Filed 5 months ago. A general contractor is named on the filing and 2 anticipated permit categories have not yet appeared.

Filing status does not indicate whether the work has been awarded.

Anticipated permit categories not yet filed

Electrical & low voltageElevators

Based on the project scope and filing history. Filing status does not indicate whether the work has been awarded. Categories already covered by a firm on the filing are excluded.

Firms on the filing

EngineeringSfdpw

Roles are taken from the permit record. Firm names are part of the paid product.

Filing history

2 filings on record, first filed Apr 2025, latest activity Apr 2026. Dated, itemized filing history is part of the paid product.

Not shown on this page

Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
See matching projects free
10 project unlocks included every month · no credit card

Sourced from San Francisco Department of Building Inspection public filings.