PermitPipeline
Firms › SF general contractors › Abm Electrical Solutions Dba Linc Lighti › Under $100K Financial District/South Beach…

Under $100K Financial District/South Beach commercial renovation

Filed Jun 2025 · additions alterations or repairs

Installation of 2-boltdown level 2 ev chargers for used by valet service in garage. install (4) 40amp 2-pole breakers into existing electrical panel. run conduit on existing racks and pull wire to accommodate ev…

Under $100K
value range
1
filings to date

Project scope

Installation of 2-boltdown level 2 ev chargers for used by valet service in garage. install (4) 40amp 2-pole breakers into existing electrical panel. run conduit on existing racks and pull wire to accommodate ev chargers. bolt down (2) bollards per charger

Why this may be worth pursuing

Filed Jun 2025, in the Under $100K range. A general contractor is named on the filing.

Firms on the filing

General contractorAbm Electrical Solutions Dba Linc Lighti

Roles are taken from the permit record. Firm names are part of the paid product.

Filing history

1 filing on record, first filed Jun 2025. Dated, itemized filing history is part of the paid product.

Not shown on this page

Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Start 14-day trial →
Pro or Team · $0 today · cancel anytime

Sourced from San Francisco Department of Building Inspection public filings.