PermitPipeline
FirmsSF architects & engineersMarissa Brandon ArchitectUnder $100K Pacific Heights multifamily…

Under $100K Pacific Heights multifamily renovation

Filed 2 months ago · otc alterations permit · Grade D · Mid stage

Removing (e) barrel vauted garage. install new garage door. rebuild (e) exterior stair from sidewalk to front door with rise and run per code. remove (e) exterior stair on west side. (e) interior stair from level 2 to 3…

Under $100K
value range
1
filings to date

Project scope

Removing (e) barrel vauted garage. install new garage door. rebuild (e) exterior stair from sidewalk to front door with rise and run per code. remove (e) exterior stair on west side. (e) interior stair from level 2 to 3 rebuilt per code under separate permit

Why this may be worth pursuing

Filed 2 months ago, in the Under $100K range. A general contractor is named on the filing; an engineering firm is identified.

Firms on the filing

ArchitectureMarissa Brandon Architect Engineering1 firm

Roles are taken from the permit record. Firm names are part of the paid product.

Filing history

1 filing on record, first filed Jul 2026. Dated, itemized filing history is part of the paid product.

Not shown on this page

Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
See matching projects free
10 project unlocks included every month · no credit card

Sourced from San Francisco Department of Building Inspection public filings.