$2.1M Outer Mission renovation
Demolition of existing surfaces for the installation of ev charging station. grading of surfaces associated with evse to comply with ada requirement. install 1 utility transformer, 1 switchboard assembly, 8 400kwā¦
Project scope
Demolition of existing surfaces for the installation of ev charging station. grading of surfaces associated with evse to comply with ada requirement. install 1 utility transformer, 1 switchboard assembly, 8 400kw alpitronic hyc400 ev charges, 16 ev sign posts, 26 bollards, 1 ornamental fence
Why this may be worth pursuing
Filing status does not indicate whether the work has been awarded.
Anticipated permit categories not yet filed
Based on the project scope and filing history. Filing status does not indicate whether the work has been awarded. Categories already covered by a firm on the filing are excluded.
Firms on the filing
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
Not shown on this page
Sourced from San Francisco Department of Building Inspection public filings.