PermitPipeline
FirmsSF architects & engineersKimley-Horn And Asso.$2.1M Outer Mission renovation

$2.1M Outer Mission renovation

Filed 21 days ago · otc alterations permit · Grade A+ · Early stage · No general contractor named on permit

Demolition of existing surfaces for the installation of ev charging station. grading of surfaces associated with evse to comply with ada requirement. install 1 utility transformer, 1 switchboard assembly, 8 400kw…

$2.1M
declared value
1
filings to date

Project scope

Demolition of existing surfaces for the installation of ev charging station. grading of surfaces associated with evse to comply with ada requirement. install 1 utility transformer, 1 switchboard assembly, 8 400kw alpitronic hyc400 ev charges, 16 ev sign posts, 26 bollards, 1 ornamental fence

Why this may be worth pursuing

Filed 21 days ago, with a declared value of $2.1M. No general contractor is named on permit and 2 anticipated permit categories have not yet appeared.

Filing status does not indicate whether the work has been awarded.

Anticipated permit categories not yet filed

Electrical & low voltagePlumbing

Based on the project scope and filing history. Filing status does not indicate whether the work has been awarded. Categories already covered by a firm on the filing are excluded.

Firms on the filing

EngineeringKimley-Horn And Asso. No general contractor named on permit

Roles are taken from the permit record. Firm names are part of the paid product.

Filing history

1 filing on record, first filed Jul 2026. Dated, itemized filing history is part of the paid product.

Not shown on this page

Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Unlock full project details →
Choose Brief, Pro or Team · 14-day trial

Sourced from San Francisco Department of Building Inspection public filings.