PermitPipeline
FirmsSF architects & engineersRevel Architecture$1M-$5M Financial District/South Beach…

$1M-$5M Financial District/South Beach commercial renovation

Filed 1 month ago · otc alterations permit · Grade A · Mid stage

Deferred mechanical+ electrical permit. ref - mechanical furn+ install new reheat vav box, new cooling only vav boxes, new fsd, transfer boot, heating hot water pipes, ductwork + air dist. relocate sound boot. elect…

$1M-$5M
value range
2
filings to date

Project scope

Deferred mechanical+ electrical permit. ref - mechanical furn+ install new reheat vav box, new cooling only vav boxes, new fsd, transfer boot, heating hot water pipes, ductwork + air dist. relocate sound boot. elect: new power + signal devices throught the space, new t 24. lightings and control

Why this may be worth pursuing

Filed 1 month ago, in the $1M-$5M range. A general contractor is named on the filing; 2 engineering firms are identified.

Firms on the filing

ArchitectureRevel Architecture Engineering2 firmsGeneral contractor1 firm

Roles are taken from the permit record. Firm names are part of the paid product.

Filing history

2 filings on record, first filed Apr 2026, latest activity Aug 2026. Dated, itemized filing history is part of the paid product.

Not shown on this page

Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
See matching projects free
10 project unlocks included every month · no credit card

Sourced from San Francisco Department of Building Inspection public filings.