Firms › SF general contractors › Drive Technologies Inc Dba Treehouse › Under $100K Castro/Upper Market multifamily…
Under $100K Castro/Upper Market multifamily renovation
Filed Jul 2025 · otc alterations permit
Install a 20/50 quad breaker utilizing the existing 20a, 240v circuit in the 80a subpanel. hardwire the chargepoint charger to the left of the panel, the customer would like this installed to the left of the furnace and…
Under $100K
value range
1
filings to date
Project scope
Install a 20/50 quad breaker utilizing the existing 20a, 240v circuit in the 80a subpanel. hardwire the chargepoint charger to the left of the panel, the customer would like this installed to the left of the furnace and right of the door frame. de-rate the charger to 40a current draw
Why this may be worth pursuing
Filed Jul 2025, in the Under $100K range. A general contractor is named on the filing.
Firms on the filing
General contractorDrive Technologies Inc Dba Treehouse
General contractor1 firm
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
1 filing on record, first filed Jul 2025.
Dated, itemized filing history is part of the paid product.
Not shown on this page
Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
10 project unlocks included every month · no credit card
Previous project$21K Sunset/Parkside multifamily renovation
2 of 3 select projects
Next project$150K Marina single-family renovation
Sourced from San Francisco Department of Building Inspection public filings.