PermitPipeline
FirmsSF architects & engineersGolden Gate Fire$500K-$1M Chinatown commercial renovation

$500K-$1M Chinatown commercial renovation

Filed 5 months ago · otc alterations permit · Grade B · Mid stage

12th floor: deferred mechanical + electrical permit. permit. mechanical selective demolition + cap of med to low pressure ductwork. new distribution for vav boxes, new hot water reheat distribution piping air balance…

$500K-$1M
value range
3
filings to date

Project scope

12th floor: deferred mechanical + electrical permit. permit. mechanical selective demolition + cap of med to low pressure ductwork. new distribution for vav boxes, new hot water reheat distribution piping air balance. electrical new power + signal devices throughout. new 2022 t24 complaint lighting + controls

Why this may be worth pursuing

Filed 5 months ago, in the $500K-$1M range. A general contractor is named on the filing; 2 architecture firms are identified, an engineering firm is identified, a design firm is identified.

Firms on the filing

DesignGolden Gate Fire Architecture2 firmsEngineering1 firmDesign1 firmGeneral contractor1 firm

Roles are taken from the permit record. Firm names are part of the paid product.

Filing history

3 filings on record, first filed Nov 2025, latest activity Mar 2026. Dated, itemized filing history is part of the paid product.

Not shown on this page

Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
See matching projects free
10 project unlocks included every month · no credit card

Sourced from San Francisco Department of Building Inspection public filings.