PermitPipeline
FirmsSF architects & engineersStudio Fallon ArchitectureUnder $100K Mission multifamily renovation

Under $100K Mission multifamily renovation

Filed 2 months ago · otc alterations permit · Grade B · Mid stage

Attic floor -interior renovation of a bathroom on the 3rd flr and exterior window to provide egress to an existing bedroom. windows at 2nd story untouched

Under $100K
value range
1
filings to date

Why this may be worth pursuing

Filed 2 months ago, in the Under $100K range. A general contractor is named on the filing.

Firms on the filing

ArchitectureStudio Fallon Architecture General contractor1 firm

Roles are taken from the permit record. Firm names are part of the paid product.

Filing history

1 filing on record, first filed Dec 2025, latest activity Jun 2026. Dated, itemized filing history is part of the paid product.

Not shown on this page

Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
See matching projects free
10 project unlocks included every month · no credit card

Sourced from San Francisco Department of Building Inspection public filings.