PermitPipeline
Firms › NYC architects & engineers › PERMANENT ENGINEERING P.C. › $500K-$1M Staten Island renovation

$500K-$1M Staten Island renovation

Filed 1 month ago · Alteration · Grade A+ · Mid stage · No general contractor named on permit

BOILER APPLICATION FILED IN ORDER TO INDICATE REPLACEMENT OF 2 BOILER AT EXISTING PROPERTY, LOCATED IN BASEMENT SPACE.REPLACE FUEL OIL PIPING SUPPLY AND RETURN.CONNECTING TO NEW GAS LINE AND EX. WATER PIPING. CONNECTION…

$500K-$1M
value range
2K
square feet
1
filings to date

Project scope

BOILER APPLICATION FILED IN ORDER TO INDICATE REPLACEMENT OF 2 BOILER AT EXISTING PROPERTY, LOCATED IN BASEMENT SPACE.REPLACE FUEL OIL PIPING SUPPLY AND RETURN.CONNECTING TO NEW GAS LINE AND EX. WATER PIPING. CONNECTION TO NEW FLUE AND VENT

Why this may be worth pursuing

Filed 1 month ago, in the $500K-$1M range. No general contractor is named on permit and 2 anticipated permit categories have not yet appeared.

Filing status does not indicate whether the work has been awarded.

Anticipated permit categories not yet filed

MechanicalPlumbing

Based on the project scope and filing history. Filing status does not indicate whether the work has been awarded. Categories already covered by a firm on the filing are excluded.

Firms on the filing

EngineeringPERMANENT ENGINEERING P.C. No general contractor named on permit

Roles are taken from the permit record. Firm names are part of the paid product.

Filing history

1 filing on record, first filed Aug 2026. Dated, itemized filing history is part of the paid product.

Not shown on this page

Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Start 14-day trial →
Pro or Team · $0 today · cancel anytime

Sourced from New York City Department of Buildings public filings.