PermitPipeline

Flack + Lirtz

Engineering firm · San Francisco permit activity
☆ Save firm

Engineering firm active in San Francisco construction, tracked from public building-permit filings.

#716
by NYC filing activity
among NYC architects & engineers, last 90 days
3
project records
Jan 2025 to Jun 2026
1/16
active weeks
weeks with a filing (last 16)
3 projects Scopes, declared values and this firm's role on each one See 3 projects involving Flack + Lirtz
Recent projects involving this firm
Financial District/South Beach
Revision to #202501027602- adding push button at restroom ada stall partition door
Jun 26, 2026 · additions alterations or repairs · Engineer · 7 filings
$15.1M
Financial District/South Beach
8th floor. demo existing fire alarm system on the 8th floor. related to floor remodel. add 29…
Sep 23, 2025 · otc alterations permit · Engineer · 3 filings
$2.5M
Financial District/South Beach
3/f: relocate (17) pendent sprinklers on the 3rd floor. ti ref# 202504255235
Jul 23, 2025 · otc alterations permit · Engineer · 3 filings
$69K

Neighbourhood, filing date, scope and declared value are shown here. Exact addresses, full filing histories and project teams are part of the paid product.

See every project involving Flack + Lirtz → start a 14-day trial
Most recent filing: Financial District/South Beach · Jun 26, 2026 1 active · 0 newly observed last 90 days

Filing activity · last 16 weeks

APR
MAY
JUN
JUL
1
active projects (last 90d)
0
newly observed (last 90d)
Jun 2026
peak month

Project mix · by use

Commercial100%

Geography · by borough

Financial District/South Beach100%

Shared-project connections

#FirmPrimary roleSharedRelative
1Jullian P. MoritzEngineering3
2MbhArchitecture1
3MbhArchitecture1
4Nabih YoussefEngineering1
5Nabih Youssef AssociatesEngineering1
1Gci, IncGeneral contractor1
2Golden Gate Fire Protection IncGeneral contractor1
3Johnson Controls Inc.General contractor1
4Pioneer Fire Inc.General contractor1
5Redwood Electric Group IncGeneral contractor1
Firms that appear on the same San Francisco permit filings. Association on shared filings, not a proven working relationship.

Frequently asked questions

How many SF projects has Flack + Lirtz filed?
PermitPipeline tracks 3 San Francisco building-permit projects for Flack + Lirtz (Jan 2025 to Jun 2026). 1 had filing activity in the last 90 days.
Does Flack + Lirtz work on commercial or residential projects?
Across its tracked San Francisco filings, 100% of Flack + Lirtz's projects are commercial and 0% are residential (multifamily, small residential, or single-family). Based on permit records, not self-reported.
Where in San Francisco does Flack + Lirtz work?
100% of Flack + Lirtz's tracked San Francisco projects are in Financial District/South Beach.
What is a typical Flack + Lirtz project worth?
Across the 13 tracked projects with a declared value, Flack + Lirtz averages $1.4M per project (declared value on the permit filing, not contract value).
Which firms does Flack + Lirtz work with most often?
Flack + Lirtz most frequently appears on the same San Francisco permit filings as Jullian P. Moritz, Gci, Inc, Golden Gate Fire Protection Inc. Appearing together indicates association on shared filings, not a proven working relationship.
Is Flack + Lirtz an engineering firm?
Flack + Lirtz is listed as an engineering firm on its San Francisco permit filings. Roles on this profile are derived from the role each firm holds on public DOB filings.
Public aggregate — full project records are part of the paid leads product. Updated daily from SF DBI filings.
Firm directories by market