PermitPipeline

Geddes Ulinskas Arch.

Architecture firm · San Francisco permit activity
☆ Save firm

Architecture firm active in San Francisco construction, tracked from public building-permit filings.

#742
by NYC filing activity
among NYC architects & engineers, last 90 days
3
project records
Feb 2025 to Jul 2026
1/16
active weeks
weeks with a filing (last 16)
3 projects Scopes, declared values and this firm's role on each one See 3 projects involving Geddes Ulinskas Arch.
Recent projects involving this firm
Potrero Hill
Revision to pa# 202211176785: to reflect removal of one interior door at 1st floor from scope
Jul 17, 2026 · otc alterations permit · Architect
$1
Pacific Heights
Struct. and arch. revision to p/a 202505055790 including lowering of the first floor level by…
Jan 14, 2026 · otc alterations permit · Architect · 3 filings
$260K
Financial District/South Beach
Gpha: modify fire sprinkler system for tenant improvement. add 6, relocate 34. ref permit…
Dec 2, 2025 · otc alterations permit · Architect · 2 filings
$738K

Neighbourhood, filing date, scope and declared value are shown here. Exact addresses, full filing histories and project teams are part of the paid product.

See every project involving Geddes Ulinskas Arch. → start a 14-day trial
Most recent filing: Potrero Hill · Jul 17, 2026 1 active · 1 newly observed last 90 days

Filing activity · last 16 weeks

APR
MAY
JUN
JUL
1
active projects (last 90d)
1
newly observed (last 90d)
Jul 2026
peak month

Project mix · by use

Residential100%

Geography · by borough

Financial District/South Beach34%
Pacific Heights33%
Potrero Hill33%

Shared-project connections

#FirmPrimary roleSharedRelative
1N. Y EngineeringEngineering1
2N.Y. EngineeringEngineering1
1Vonnegut Thoreau ConstructionGeneral contractor1
2Aaron Gordon Construction IncGeneral contractor1
3Allied Fire ProtectionGeneral contractor1
4Black Mountain DevelopmentGeneral contractor1
5Bergquist BuildersGeneral contractor1
Firms that appear on the same San Francisco permit filings. Association on shared filings, not a proven working relationship.

Frequently asked questions

How many SF projects has Geddes Ulinskas Arch. filed?
PermitPipeline tracks 3 San Francisco building-permit projects for Geddes Ulinskas Arch. (Feb 2025 to Jul 2026). 1 had filing activity in the last 90 days.
Does Geddes Ulinskas Arch. work on commercial or residential projects?
Across its tracked San Francisco filings, 0% of Geddes Ulinskas Arch.'s projects are commercial and 100% are residential (multifamily, small residential, or single-family). Based on permit records, not self-reported.
Where in San Francisco does Geddes Ulinskas Arch. work?
33% of Geddes Ulinskas Arch.'s tracked San Francisco projects are in Financial District/South Beach.
What is a typical Geddes Ulinskas Arch. project worth?
Across the 6 tracked projects with a declared value, Geddes Ulinskas Arch. averages $166K per project (declared value on the permit filing, not contract value).
Which firms does Geddes Ulinskas Arch. work with most often?
Geddes Ulinskas Arch. most frequently appears on the same San Francisco permit filings as N. Y Engineering, N.Y. Engineering, Vonnegut Thoreau Construction. Appearing together indicates association on shared filings, not a proven working relationship.
Is Geddes Ulinskas Arch. an architecture firm?
Geddes Ulinskas Arch. is listed as an architecture firm on its San Francisco permit filings. Roles on this profile are derived from the role each firm holds on public DOB filings.
Public aggregate — full project records are part of the paid leads product. Updated daily from SF DBI filings.
Firm directories by market