PermitPipeline

Integrand Structural Engineer

Engineering firm · San Francisco permit activity
☆ Save firm

Engineering firm active in San Francisco construction, tracked from public building-permit filings.

#666
by NYC filing activity
among NYC architects & engineers, last 90 days
4
project records
Jan 2025 to Jul 2026
1/16
active weeks
weeks with a filing (last 16)
4 projects Scopes, declared values and this firm's role on each one See 4 projects involving Integrand Structural Engineer
Recent projects involving this firm
Mission
Structural revision to pa#2022-0420-2645 s1: a replacement of the (e) site condition at the…
Jul 10, 2026 · otc alterations permit · Engineer
$5K
Potrero Hill
A 610 s.f. vertical, 94 s.f.front & 80 s.f. rear addition. 134 sq. ft. of (e) garage to convert…
Oct 31, 2025 · additions alterations or repairs · Engineer
$1.2M
Glen Park
Revision to pa 202405293134 to add new casement wood window on level 1 living room facing to…
Sep 16, 2025 · otc alterations permit · Engineer
$6K

Neighbourhood, filing date, scope and declared value are shown here. Exact addresses, full filing histories and project teams are part of the paid product.

See every project involving Integrand Structural Engineer → start a 14-day trial
Middle 50% of declared values: $6K–$1.2M (median $154K) Most recent filing: Mission · Jul 10, 2026 1 active · 1 newly observed last 90 days

Filing activity · last 16 weeks

APR
MAY
JUN
JUL
1
active projects (last 90d)
1
newly observed (last 90d)
Jul 2026
peak month

Project mix · by use

Residential100%

Geography · by borough

Glen Park25%
Mission25%
Potrero Hill25%
Sunset/Parkside25%

Shared-project connections

#FirmPrimary roleSharedRelative
1Andrew Morrall ArchitectArchitecture2
1Pacific Edge Construction IncGeneral contractor1
2Perez Construction Llc.General contractor1
3Hammerhouse ConstructionGeneral contractor1
Firms that appear on the same San Francisco permit filings. Association on shared filings, not a proven working relationship.

Frequently asked questions

How many SF projects has Integrand Structural Engineer filed?
PermitPipeline tracks 4 San Francisco building-permit projects for Integrand Structural Engineer (Jan 2025 to Jul 2026). 1 had filing activity in the last 90 days.
Does Integrand Structural Engineer work on commercial or residential projects?
Across its tracked San Francisco filings, 0% of Integrand Structural Engineer's projects are commercial and 100% are residential (multifamily, small residential, or single-family). Based on permit records, not self-reported.
Where in San Francisco does Integrand Structural Engineer work?
25% of Integrand Structural Engineer's tracked San Francisco projects are in Glen Park.
What is a typical Integrand Structural Engineer project worth?
Across the 4 tracked projects with a declared value, Integrand Structural Engineer averages $341K per project (declared value on the permit filing, not contract value).
Which firms does Integrand Structural Engineer work with most often?
Integrand Structural Engineer most frequently appears on the same San Francisco permit filings as Andrew Morrall Architect, Pacific Edge Construction Inc, Perez Construction Llc.. Appearing together indicates association on shared filings, not a proven working relationship.
Is Integrand Structural Engineer an engineering firm?
Integrand Structural Engineer is listed as an engineering firm on its San Francisco permit filings. Roles on this profile are derived from the role each firm holds on public DOB filings.
Public aggregate — full project records are part of the paid leads product. Updated daily from SF DBI filings.
Firm directories by market