The Toboni Group
General contractor · San Francisco permit activity
General contractor active in San Francisco construction, tracked from public building-permit filings.
#130
by NYC filing activity
among NYC general contractors, last 90 days
30
project records
Jan 2025 to Jun 2026
5/16
active weeks
weeks with a filing (last 16)
30 projects
Scopes, declared values and this firm's role on each one
See 30 projects involving The Toboni Group
Recent projects involving this firm
Presidio Heights
Installation of hot tub on exterior terrace as well as new gate and guardrail
$30K
Seacliff
3rd floor bathroom in kind renovation, patch + paint, add bookshelves. waterproofing @ rear…
$100K
West of Twin Peaks
Work category: 1m; install mechanical systems and associated components, including refrigerant…
$1.7M
Neighbourhood, filing date, scope and declared value are shown here. Exact addresses, full filing histories and project teams are part of the paid product.
See every project involving The Toboni Group → start a 14-day trial
30 project records for The Toboni Group: addresses, values, project teams
Start 14-day free trial
Middle 50% of declared values: $10K–$500K (median $90K)
Most recent filing: Presidio Heights · Jun 26, 2026
5 active · 4 newly observed last 90 days
What brings you here?
One click. It shapes what we build next.
Filing activity · last 16 weeks
APR
MAY
JUN
JUL
5
active projects (last 90d)
4
newly observed (last 90d)
Jun 2026
peak month
Project mix · by use
Residential100%
Geography · by borough
Presidio Heights43%
West of Twin Peaks18%
Pacific Heights14%
Seacliff14%
Mission11%
Shared-project connections
| # | Firm | Primary role | Shared | Relative |
|---|---|---|---|---|
| 1 | Sutro Architects | Architecture | 6 | |
| 2 | Double -D Engineering | Engineering | 5 | |
| 3 | Dolmen Structural Engineer | Engineering | 3 | |
| 4 | Yuflux Engineering | Engineering | 2 | |
| 5 | Graham Architects | Architecture | 2 | |
| 1 | Crime Watch Security Sys Llc | General contractor | 1 | |
| 2 | R Lowy Fire Protection Inc | General contractor | 1 |
Firms that appear on the same San Francisco permit filings. Association on shared filings, not a proven working relationship.
Frequently asked questions
How many SF projects has The Toboni Group filed?▾
PermitPipeline tracks 30 San Francisco building-permit projects for The Toboni Group (Jan 2025 to Jun 2026). 5 had filing activity in the last 90 days.
Does The Toboni Group work on commercial or residential projects?▾
Across its tracked San Francisco filings, 0% of The Toboni Group's projects are commercial and 100% are residential (multifamily, small residential, or single-family). Based on permit records, not self-reported.
Where in San Francisco does The Toboni Group work?▾
40% of The Toboni Group's tracked San Francisco projects are in Presidio Heights.
What is a typical The Toboni Group project worth?▾
Across the 40 tracked projects with a declared value, The Toboni Group averages $419K per project (declared value on the permit filing, not contract value).
Which firms does The Toboni Group work with most often?▾
The Toboni Group most frequently appears on the same San Francisco permit filings as Sutro Architects, Double -D Engineering, Dolmen Structural Engineer. Appearing together indicates association on shared filings, not a proven working relationship.
Is The Toboni Group a general contractor?▾
The Toboni Group is listed as a general contractor on its San Francisco permit filings. Roles on this profile are derived from the role each firm holds on public DOB filings.
Public aggregate — full project records are part of the paid leads product. Updated daily from SF DBI filings.
Firm directories by market