PermitPipeline

Ze Sheng Liao

General contractor · San Francisco permit activity
☆ Save firm

General contractor active in San Francisco construction, tracked from public building-permit filings.

#1681
by NYC filing activity
among NYC general contractors, last 90 days
4
project records
Aug 2025 to Mar 2026
0/16
active weeks
weeks with a filing (last 16)
4 projects Scopes, declared values and this firm's role on each one See 4 projects involving Ze Sheng Liao
Recent projects involving this firm
Outer Richmond
Tenant improvement and change of use retail to gym. install new gym flooring, gym equipment,…
Mar 6, 2026 · otc alterations permit · General contractor
$100K
West of Twin Peaks
Existing bathroom remodel for a new shower, new toilet, and new bathroom sink. no wall…
Dec 15, 2025 · otc alterations permit · General contractor · 2 filings
$12K
Sunset/Parkside
Revision to 202508284150, reduce scope of work delete kitchen work
Oct 31, 2025 · otc alterations permit · General contractor · 2 filings
$40K

Neighbourhood, filing date, scope and declared value are shown here. Exact addresses, full filing histories and project teams are part of the paid product.

See every project involving Ze Sheng Liao → start a 14-day trial
Middle 50% of declared values: $35K–$100K (median $40K) Most recent filing: Outer Richmond · Mar 6, 2026 0 active · 0 newly observed last 90 days

Filing activity · last 16 weeks

APR
MAY
JUN
JUL
0
active projects (last 90d)
0
newly observed (last 90d)
peak month

Project mix · by use

Commercial33%
Residential67%

Geography · by borough

Outer Richmond50%
Sunset/Parkside25%
West of Twin Peaks25%

Shared-project connections

#FirmPrimary roleSharedRelative
1Az Design & Engineering IncArchitecture2
2Andy TanEngineering1
None on shared filings.
Firms that appear on the same San Francisco permit filings. Association on shared filings, not a proven working relationship.

Frequently asked questions

How many SF projects has Ze Sheng Liao filed?
PermitPipeline tracks 4 San Francisco building-permit projects for Ze Sheng Liao (Aug 2025 to Mar 2026). 0 had filing activity in the last 90 days.
Does Ze Sheng Liao work on commercial or residential projects?
Across its tracked San Francisco filings, 33% of Ze Sheng Liao's projects are commercial and 67% are residential (multifamily, small residential, or single-family). Based on permit records, not self-reported.
Where in San Francisco does Ze Sheng Liao work?
50% of Ze Sheng Liao's tracked San Francisco projects are in Outer Richmond.
What is a typical Ze Sheng Liao project worth?
Across the 6 tracked projects with a declared value, Ze Sheng Liao averages $31K per project (declared value on the permit filing, not contract value).
Which firms does Ze Sheng Liao work with most often?
Ze Sheng Liao most frequently appears on the same San Francisco permit filings as Az Design & Engineering Inc, Andy Tan. Appearing together indicates association on shared filings, not a proven working relationship.
Is Ze Sheng Liao a general contractor?
Ze Sheng Liao is listed as a general contractor on its San Francisco permit filings. Roles on this profile are derived from the role each firm holds on public DOB filings.
Public aggregate — full project records are part of the paid leads product. Updated daily from SF DBI filings.
Firm directories by market