Integrated Design Group is an architecture firm with 10 tracked New York City building-permit projects on record, with the latest filing in that record 72 days ago. Its filings (Sep 2024 to Jul 2026) are concentrated in Manhattan. A typical project in the record declares $60K–$700K. If you work at Integrated Design Group, claim this page to add a description.
Claim your firm and publish up to three projects with photographs. Claiming also gives you your logo, a short introduction and your own contact details.
Filing activity · 16 weeks to Oct 7, 2026 · peak Jul 2026
Project mix · by use
Geography · by borough
Shared-project connections
| # | Firm | Primary role | Shared | Relative |
|---|---|---|---|---|
| 1 | Burns Engineering, PC | Engineering | 2 | |
| 2 | Polise Consulting Engineer | Engineering | 1 | |
| 1 | Pavarini Mcgovern LLC | General contractor | 1 | |
| 2 | Bonanza Contracting LLC | General contractor | 1 | |
| 3 | Jakes Sheetrock, Inc | General contractor | 1 |
Create a free account to see every firm on these projects and how many projects each one shares.
Owner and developer names, and the projects behind each connection, are part of the Leads product.
Get an email when Integrated Design Group files a new project. Monitor up to 10 firms free.
Create your free account
Already have an account? Log in
Need full project records — addresses, values, parties? Start 14-day free trial
based on 10 firm filings vs 153,823 NYC filings
Frequently asked questions
How many NYC projects does Integrated Design Group appear on?▾
Does Integrated Design Group work on commercial or residential projects?▾
Where in New York City does Integrated Design Group work?▾
What is a typical Integrated Design Group project worth?▾
Which firms appear most often on the same filings as Integrated Design Group?▾
Is Integrated Design Group an architecture firm?▾
How far back does this record go?▾
New York City Department of Buildings permit filings.
Read directly from NYC DOB filings.
None are shown until the firm supplies them.